BC Floor Covering Association
  • Home
    • Mission Statement and Objectives
    • A History of Flooring >
      • The History of Bamboo
      • The History of Cork
      • The History of Carpet
      • The History of Hardwood
      • The History of Laminate
      • The History of Resilient
  • Flooring Into The Future
    • Sponsorship Opportunities
    • Speaker Listings
    • Company Profiles
  • Webinar Library
  • Gallery
  • Board of Directors
  • Consumer Resources
    • Industry links >
      • Carpet Industry links
      • Hardwood Industry links
      • Laminate Industry links
      • Resilient Industry links
      • Cork Industry links
      • Bamboo Industry links
      • Apprenticeship Program links
      • Other Industry links
  • Membership Directory
  • Join the BCFCA or Renew Membership
  • Member Benefits
    • Accent Inns Hotel Zed
  • Floor Inspections
    • Floor Inspection Service
  • Education
  • NFCA Floor Covering Reference Manual
    • About the manual
  • Employment Opportunities
  • Events Calendar
  • Awards
  • Blog
  • Contact

Moisture test before your new wood flooring is delivered.

8/11/2015

0 Comments

 
Picture
The importance of testing the sub-floor for moisture before your hardwood flooring is delivered to the job site cannot be overstated.

I've seen it time and again where perfectly good flooring is ruined because the homeowner or flooring contractor deliver the wood flooring before ensuring that the installation area is fully dry.

Small amounts of moisture, not detectable by the eye, are enough to cause significant expansion in the new flooring.   Later, when the flooring dries out because of normal house heating, it will shrink leaving unsightly gaps between the boards.
 
Use a moisture meter.  Rent one if necessary.
  • Plywood should read no more than 12%.
  • New hardwood flooring should read 7 to 8%.
The difference in moisture content between hardwood and plywood should be no more than 4%.

0 Comments

LVT Shrinks and Expands

7/28/2015

0 Comments

 
Proper conditioning of flooring materials helps prevent shrinkage, expansion and deformation of floor covering product. Most flooring products require strict conditions to exists on site before they are shipped. Temperature, relative humidity and moisture levels must all meet manufacturers specifications.
Picture
0 Comments

The Customer Isn't Always Right!

5/22/2015

0 Comments

 
As a flooring contractor who is being pushed to install flooring too early and against manufacturers’ installation guidelines the word 'no' is your only trusted friend.

When it is known that sub-floor flatness, moisture levels, ambient relative humidity, temperature etc. are not at recommended levels and yet the building owner and/or General contractor are insisting you start the installation against your better judgement, get it in writing! If you don't have clear written instructions from the Building owner to proceed then you won't fare well in court should you be sued.

Our advice is as Follows:

1. Say 'no' and wait for job site conditions to meet manufacturers’ recommendations before proceeding.

If 'no' is not an option then:

Write a letter to the Building owner and General contractor stating why you recommend delaying the installation and also stating that proceeding will void the product and installation warranty. do not proceed with installation until you are in receipt of written instructions from the Building owner that states they fully understand the risks and wish to proceed against manufactures’ specifications with no product warranty in place.

0 Comments

High Fly Ash content concrete - problem or not?

5/13/2015

1 Comment

 
Picture
If you talk to enough people on the subject of site preparation and flooring issues eventually the question of fly ash concrete and bond failure will crop up. I’ve heard the question from all corners of the industry and there are few definitive answers.

As a result, many commercial flooring contractors are not warrantying their installations over such concrete. Instead, they add a disclaimer in their terms of contract stating that no installation warranty is offered over substrates that contain a greater than 20% fly ash content. Yes, the flooring product warranty will be in place but that’s no good if the adhesive fails.

SO WHAT’S THE PROBLEM?
1. The general consensus is that concrete, with a high fly ash content, results in a denser, less porous product, which in turn interferes with the flooring adhesive and/or leveling compound’s ability to bond. Hard trowelling of the concrete surface to a super smooth finish exacerbates the problem.

2. Collectively, manufacturers have not come out with a clear position on the subject. Is there a bonding problem? If there is, is it slab density related or some other ingredient in the concrete effecting bond? Moisture testing? Should Calcium Chloride (MVER) tests be recommended over this type of concrete? Answer, not sure... many manufacturers call for both RH Probe and Calcium Chloride tests to be taken simultaneously.

WHY IS FLY ASH USED?
Fly ash as an additive in concrete has been around for a long time and will continue to be used for a number of reasons: 1. It helps produce a stronger, more durable concrete product that is less permeable.
2. It aids in the reduction of efflorescence, a
white chalky substance that develops on concrete surfaces.
3. It’s use in concrete is LEED driven
because:
  1. It reduces the energy intensive use of Portland Cement.
  2. Fly ash is a by-product of burning coal and its use in concrete is one way to use this waste product up.


Picture
The reality is that fly ash as an ingredient in concrete will likely increase over time as LEED projects continue to grow in number. So what do you do when faced with an instal- lation over this type of substrate?
  1. As the flooring contractor you should understand the concrete surface you are installing over before proceeding. Ask questions about the concrete mix.
  2. Consult the adhesive / leveler manufacturer before you proceed. Fully understand the limitations of adhesive or leveler that is expected to bond to the concrete surface.
  3. Understand your options regarding possible product upgrades that work better with concrete of this type.
  4. Communicate in writing with the general contractor and building owner regarding voided warranties before you proceed because the industry standard states ‘Installation implies acceptance of conditions’.

Picture
   5.  Shot blast or scarify the concrete surface to increase             mechanical bond. Concrete specifications should call             for a broom or textured finish of the slab. This work is         the responsibility of the general contractor.
    6.
Take a bond (or pull) test before proceeding.                     Document the test by video recording it.
    7. If you have a choice then choose the RH In-Situ probe        moisture test (ASTM F-2170) over the Anhydrous                 Calcium Chloride (MVER) test (ASTM F-1869). Moisture         Vapor Emission Rates (MVER) in fly ash concrete are             reduced because the concrete product is denser. This         increases the risk that an acceptable MVER will be             recorded at the surface while excess moisture is still             present deeper in the slab. When an MVER meets the         manufacturer’s warranty requirements yet fails to                 reveal the true moisture content of the concrete at             deeper levels, the floor installation will be given the             go-ahead risking problems later on. Note that moisture         testing is the responsibility of the general contractor.

For clarity on this issue, the industry requires manufacturers to lead the way and replace opinion with scientific, test-based fact. With this done the end user will stand a better chance of receiving their new floor with product and installation warranties intact.


1 Comment

The Moisture Monster In Our Industry. Part 3.

5/7/2015

0 Comments

 
3.  Substrate Testing

Substrate testing is often pushed onto the flooring contractor who then fails to take the tests according industry standards. Taking tests according to industry standard (ASTM), in a commercial setting, can be a complicated and expensive process.

National standards call for 3 tests for the first 1000 sqft of installation area and 1 test for every 1000 sqft thereafter, with strict rules that govern test placement and test area preparation.

The risks for the flooring contractor are obvious:
1.    He cannot protect against multiple tests being spoiled on site by other trades disturbing (spoiling) the tests.
2.    If the tests fail, who will pay for the next round?

Re-testing costs quickly add up, as does the pressure to take short cuts. The risk for the building owner is also obvious… no assurance that moisture tests will be taken properly unless a third party testing agency is used.

The NFCA Floor Covering Reference Manual states:
  • Moisture and alkalinity tests shall be conducted by an independent third party testing agency using testing methods and devices in accordance with NFCA requirements and the floor covering manufacturer's recommendations. In multiple story buildings each floor level shall be tested. All test locations shall be marked on As-Built Drawings.
  • It shall be the responsibility of the General Contractor or Building Owner to provide and pay for such testing in a timely manner.
What can be done to address these issues?
a.    Raise awareness of how sensitive many flooring products are to small amounts of moisture.
b.    Understand how long it takes concrete to become dry enough to receive flooring.
c.     Create acceptable site conditions early enough so that substrates have a chance to dry.

0 Comments

Maintenance of a wood floor

4/30/2015

1 Comment

 
Prevent Scratches – There is no such thing as a “scratch-proof” wood floor, but following these basic procedures will reduce the likelihood and frequency of scratches:
  • Do not drag or roll furniture or other heavy objects across the floor. Rollers from refrigerators, TV’s, stereos, etc. will dent the floor.  To prevent the denting first lay 1/2″ plywood on the floor and roll the appliance or heavy furniture on the plywood.
  • Place protective mats under chairs with wheels.
  • Felt padding should be permanently affixed to the legs of all furniture before it is moved into the space.
  • Do not allow people to wear spiked heels on the floor, which will damage even the hardest wood floors and finishes.
  • Pet claws should be properly trimmed at all times.
  • Work boots and shoes that may have pebbles lodged in the soles should be removed prior to entering.
Remove Grit – Care should be taken to prevent dirt, sand and grit from accumulating on the surface of your floor.  They will act like sandpaper and abrade the finish.  Walk off mats should be placed inside and out at all exterior exits, and the floor should be swept or vacuumed frequently.  All mats or rugs should be cleaned and/or replaced on a regular basis.  They should also be moved occasionally to allow natural color changes caused by light to occur evenly in all areas.  Never use latex or rubber backed mats or rugs; they will permanently stain the floor.

Avoid Standing Moisture -Water and hardwood floors don’t mix.  Never wet-mop your floor, and always clean up spills and standing water as soon as possible.  With water or any other cleaning agent, be sure to thoroughly ring out the applicator or mop prior to applying it to the floor.  A damp mop is fine as long as the moisture is limited to an amount that will evaporate almost immediately.  Moisture that is allowed to seep into the seams between the planks may cause damage to your flooring.  Do not allow soiled mats or rugs to stay on the floor as they can trap moisture on the surface.

Repairing Scratches
Picture
Blog Post by GQ Flooring, Coquitlam, BC.
1 Comment

The moisture monster in our industry. Part 2.

4/2/2015

0 Comments

 
Picture
8” thick concrete substrates don’t dry quickly.

A general rule-of-thumb for concrete drying is one month for every one inch of concrete thickness when the slab is 3" thick (under good drying conditions).  For each additional inch of slab thickness, dry times increase exponentially, i.e. a 4" slab might take 5 months, an 8" slab 12 months. Add to this wet, west coast weather, and dry times are definitely not on the construction schedule’s side.

One thing is for sure - if the concrete is not dry in time for the scheduled installation start date, a decision will have to be made.  The choices are these:

1. Delay installation and wait for the concrete to dry to recommended levels.

2. Install a moisture barrier.

3. Switch the flooring system and or products.

All too often, a fourth option is taken…

Proceed with the flooring installation (against manufacturers’ installation guide lines), waive the warranty and risk moisture related problems later on.


0 Comments

Buyer beware! 

3/20/2015

0 Comments

 
Chinese manufactured flooring products under scrutiny.  Watch the CBS '60 minutes' News team expose the poor practices that have gone unchecked in our industry.

http://www.cbsnews.com/news/lumber-liquidators-linked-to-health-and-safety-violations/
Picture
0 Comments

March 16th, 2015

3/16/2015

0 Comments

 
Picture
Flooring problems: 80% of the Problems are in 20% of the Process

Starting the floor covering installation too soon is a major cause of commercial flooring failure here in BC. Why is the flooring installed too soon? Here is the first of three reasons that will be posted on this blog:

Delays are expensive and not well-received by the General Contractor (GC).  Like most service providers, the flooring contractor is motivated to keep his customer happy. So, in spite of site conditions, when the flooring contractor is told by the general contractor to, get the job done, he is going to do just that. Disagreeing can strain customer relations, delay getting paid on time, and affect future job prospects with that customer.
This excerpt from the National Floor Covering Association (NFCA) Floor Covering Reference Manual states how the flooring contractor should respond when faced with this situation:

‘DO NOT proceed with installation until all unsatisfactory conditions have been corrected. Notify the General Contractor and/or the Building Owner in writing of all defects likely to impair finished work. Start of work implies acceptance of surfaces and conditions.’

Source:  NFCA Floor Covering Reference Manual - PART B06A - Resilient Specification Guide - .01 Installation Requirements.

0 Comments

Las Vegas hospitality suite.

2/3/2015

0 Comments

 
Yes we made it to Surfaces in Vegas again and this year was no different from last. Lots of positive energy and interesting stories shared at our hospitality suite in the Luxor. We open the suite for two days for members and non members to stop by, say hello, hear what the Association is doing and discuss our industry over a glass of wine.
0 Comments
<<Previous
Forward>>

    Author

    Write something about yourself. No need to be fancy, just an overview.

    Archives

    August 2017
    December 2016
    November 2016
    September 2016
    August 2016
    June 2016
    March 2016
    January 2016
    October 2015
    August 2015
    July 2015
    May 2015
    April 2015
    March 2015
    February 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014

    Categories

    All

    RSS Feed

    Click to set custom HTML Tweets by @bcfcassociation
© BC Floor Covering Association. All rights reserved